Category Archives: Archived

The Printworks – September 2019

Crouch End is entering into the Autumnal period with the many green spaces in the area slowly changing colour. Crouch End is attractive at any time of year, but with the arrival of each new season, you can enjoy the parks and their changing appearance. You can also enjoy the change of seasons in the quiet haven that the newly built Mews Houses at The Printworks offer.

In the heart of Crouch End, the Printworks is a peaceful enclave, cleverly tucked behind a 1920s facade. To book a viewing to see this stunning development, please contact one of our sales agents.

Habitō construction update February 2018

The structure is starting to immerse itself within the existing streetscape. The frame has now reached the 5th slab confirming the scale of Block A alone. With construction of the 5th slab ongoing, the 5th columns, stairs and lift shaft will follow immediately after. The 6th and final concrete slab will take place over the next month completing the concrete structure of Block A. The structure doesn’t end there with the penthouse steel framework to complete on top. Within the internal areas of the constructed floors, the blockwork starts to confirm the internal arrangements of the apartments.

With Block A reaching the penultimate slab, the lead in for the ground floor slab of Block B will continue with forming the rebar and concrete pour.

The Printworks construction update January 2018

The new frame set within the existing façade has now reached the third and final floor with the exterior timber wall structures now enclosing the spaces within. With the lift shaft complete which is emerging through the structure, the roof coverings are now underway, and the balcony steelwork reveals the large outside space offered to the apartments. The progress continues within the mews houses with the staircase balustrading and carpentry. Following this, the fit out will start to bring the spaces to life with the bathrooms, kitchens, flooring and decorations.

Habitō construction update January 2018

Block A of the development is well under way with the second to third floor columns, core walls, staircase and balconies completed. The third-floor rebar is currently in progress in preparation for concrete pour on the 22nd January. Blockwork to the ground floor of Block A has commenced, which will continue floor by floor. Following completion of the third-floor slab, third to fifth floor columns, fourth floor formwork and concrete pour will continue. The remaining reinforced concrete pads and drainage installation are to be constructed to the rear of the site creating Block B. The ground floor slab, columns and core walls of this block will begin immediately after to continue the superstructure of the build.